Agent evaluation and assurance

Agent evaluation harness development

Build a harness that preserves comparable evidence across agent revisions

Manual reruns cannot establish whether a prompt or tool change altered behaviour. The decision is how to build a harness that preserves comparable evidence across agent revisions. The work begins with your actual workflow and looks for the evidence that separates intended behaviour from a consequential exception. It is particularly relevant to evaluation engineers and platform owners. A useful outcome is an explicit account of what was examined, what remains uncertain, and which decision the evidence can support.

The release evidence relationship

  1. Starting evidenceRunner code

    Establish the basis for fixture contract.

  2. Decision boundaryRun identity

    Retain versions and setup with each execution.

  3. Decision artefactRunner architecture

    Retain the scoped finding and its unresolved dependencies.

Proposed working model. The customer retains the release decision.

Decision

Frame the decision around fixture contract

Questions and the evidence they need

Criterion / evidenceFixture contract
Inspect runner code for the relevant constraint or observation.
Criterion / evidenceRun identity
Inspect configuration manifests for the relevant constraint or observation.
Criterion / evidenceTeardown check
Inspect fixtures for the relevant constraint or observation.
Read each criterion against the available evidence before deciding that additional work is needed.

The decision is how to build a harness that preserves comparable evidence across agent revisions. This is relevant to evaluation engineers and platform owners when manual reruns cannot establish whether a prompt or tool change altered behaviour. Name the affected workflow, the consequence of a wrong decision, and the owner who can act on the result. The initial discussion should establish which evidence is already available and which uncertainty is material enough to investigate.

The specific failure hypothesis is that test setup changes between runs and is mistaken for an agent regression. It remains a hypothesis until examined in the deployment. Existing internal tests or operating records may already resolve it; identify the uncovered question before commissioning additional work.

Mechanism

The harness must distinguish agent failure from runner failure

Relationships within release evidence

Source or conditionFixture contract
Fix the retrieval and tool conditions being compared.
Crossing or choiceRun identity
Retain versions and setup with each execution.
Consequence or decisionTeardown check
Expose incomplete runs and residual test state.
Keep case coverage linked to the release question. Each relationship needs evidence in the actual scope.

What this specialty examines

A harness needs explicit contracts for setup, execution, observation and teardown. Preserve the case identifier, configuration, tool fixtures, timestamps and final state independently of presentation. A run that never reached the agent should remain a runner failure, distinguishable from an agent’s failed task.

The review should run a known fixture through the harness twice, vary one dependency and inspect recorded configuration and outcomes. Identify the normal route, relevant exceptions and the authoritative record of the outcome. Inspect the relevant business-system record, enforcement event or process evidence alongside any reported status. Keep incomplete cases visible, with an explanation of what their absence prevents the owner from concluding.

The tradeoff to make explicit

For this decision, realistic integrations improve relevance while deterministic fixtures improve diagnosis. Compare the available design or operating choices against the same intended outcome. If one option removes a required control or changes the task boundary, describe that difference before treating its apparent simplicity, speed or lower effort as an improvement. The decision should expose the tradeoff instead of burying it in an aggregate score.

Preparation

Connect the working inputs to the boundary being examined

Evidence packet for fixture contract

Illustrative working format

BasisRunner code
Identify provenance and the specific decision this material can inform.
ContextConfiguration manifests
Match this description to the deployed or proposed boundary being examined.
ObservationFixtures
Keep expected behaviour and the limits of the constructed example explicit.
DependencyTool mocks
Identify provenance and the specific decision this material can inform.
Illustrative preparation record. Availability, revision, and handling need confirmation.

Start with runner code, configuration manifests, fixtures, tool mocks and retained execution traces. Identify the owner, revision and operating context of each source. Sanitised examples may support initial design, but differences from actual conditions should remain explicit. Where direct access is unsuitable, a customer-controlled evidence or execution route may be considered, with agreed handling and retention.

The scope also needs the release owner, agreed expectations for a representative task case, and the authority to inspect the relevant boundary. Specify what evidence would distinguish the failure in which test setup changes between runs and is mistaken for an agent regression from acceptable behaviour. If stakeholders disagree about intended behaviour, resolve the interpretation before classifying the observed difference as a defect.

How the work proceeds

Carry fixture contract through to an accountable finding

From the scoped material to a decision record

  1. Establish conditionsRunner code

    Separate hard constraints from graded preferences.

  2. Examine the relationshipRun identity

    Apply the scoped check to teardown check.

  3. Retain the findingRunner architecture

    Record the evidence, open dependencies, and the owner’s next decision.

Proposed sequence; resolve interpretation or access gaps before relying on the next step.

Prepare the evaluation cases

Work with evaluation engineers and platform owners to assemble runner code, configuration manifests, fixtures, tool mocks and retained execution traces. Select a normal task, a consequential exception and a case with insufficient information. Identify the relevant requirement and expected result for each, then mark which outcomes need human adjudication. The preparation output is a case packet that separates blocking behaviour from graded quality preferences before any comparison is run.

Run and review the comparisons

Test the measuring system with known outcomes before trusting its reports. Include a deliberately failing fixture and a missing dependency so the team can see whether errors are retained correctly. Reproducibility means knowing which conditions were reproduced, including any live components that remain variable.

Choose the release or evaluation change

Use the reviewed cases to produce a proposed runner architecture with fixture contracts, result schemas and reproducibility checks. Distinguish a product defect from a missing test, an ambiguous requirement or an unreliable measuring method. For each, name the proposed correction and the case that would check it. The release owner can then decide whether to change the implementation, improve coverage or restrict the intended use while a specific gap remains.

Indicative artefact

Make the runner architecture usable by its owner

Runner architecture

Illustrative working format

Annotated fieldRunner architecture
Identify the assessed workflow, revision, and decision boundary.
Annotated fieldFixture contracts
Retain selection rationale, accepted alternatives, and unexamined task conditions.
Annotated fieldResult schemas
Link observations and counterevidence to the case, configuration, and conclusion limit.
Illustrative artefact structure, not a completed engagement or an observed result.

A useful decision artefact is a proposed runner architecture with fixture contracts, result schemas and reproducibility checks. Supporting material may include selected cases, configuration or process records, evidence references, a disagreement log and prioritised actions. Retain the case selection rationale and material disagreements alongside the result; otherwise the result may be mistaken for complete coverage.

Illustrative scenario

Examine teardown check through a constructed exception

A constructed case and its decision paths

Illustrative scenario

  1. SituationFixture contract

    Two revisions receive different retrieval fixtures during an apparent regression.

  2. Question to examineRun identity

    Freeze retrieval and tool fixtures before comparing revisions.

  3. Conditional next actionTeardown check

    Investigate the agent difference only if it survives the controlled setup.

Fictional example. No executed test, customer engagement, or measured outcome is implied.

Consider a fictional situation: a developer compares two agents while one silently uses a newer retrieval collection and different tool responses. The scenario is illustrative, with no client engagement, executed test or measured improvement implied.

In the two-agent comparison, first freeze the retrieval collection and tool responses. If the apparent difference disappears, the harness has prevented an unsupported model conclusion. If it remains, inspect the recorded actions before attributing the difference to a particular component.

Scope and next action

Keep the conclusion within selected task cases

Confirm fit before the next commitment

Included boundaryFixture contract
This review is limited to selected task cases.
PrerequisiteRunner code
The relevant owner must confirm access and the intended operating conditions.
Claim limitRunner architecture
The customer retains the release decision.
Bring the triggering change and existing evidence; resolve the dependency that could alter the decision.

A result applies to the recorded configuration and selected cases. It does not establish universal agent competence or authorise release. Any engagement depends on an agreed scope, qualified team, authorised access and confirmed availability. Bring the affected workflow, its current configuration or process, the triggering change and the evidence already available. The immediate scope question is prompted by the situation in which manual reruns cannot establish whether a prompt or tool change altered behaviour; confirm which missing observation would change the owner’s next action.

Ways to engage

Related engagement scopes

AI Agent Evaluation Evidence Diagnostic

Find the gaps between your release decision and the evidence behind it. Start with one agent workflow and a bounded set of questions.

Read about this offer: AI Agent Evaluation Evidence Diagnostic

AI Agent Evaluation Foundation

Turn scattered tests into a repeatable release discipline. Connect the behaviours that matter to datasets, evaluation criteria and evidence your team can maintain.

Read about this offer: AI Agent Evaluation Foundation

AI Long-Horizon Agent Evaluation

Examine what changes when an agent keeps working. Evaluate accumulated state, recovery and goal adherence across extended tasks.

Read about this offer: AI Long-Horizon Agent Evaluation

Continue exploring

Related insights and resources

Whitepaper16 MIN READ

Engineer the harness, not just the prompt

Define the contracts around an agent's decisions: what state it trusts, which actions can execute, how interrupted work resumes, and what evidence an operator needs to recover safely.

Whitepaper15 MIN READ

What would justify releasing this agent?

Replace a single pass rate with a reviewable chain of requirements, cases, observations and judgements. Distinguish task quality, control failures and uncertainty before increasing an agent's exposure.

Whitepaper5 MIN READ

The evidence behind the go-live decision

A working paper for leaders who need to explain why an agent workflow is ready for its next release. Includes a proposed evidence-pack structure, decision table and review agenda.

A little more clarity

Questions to consider.

Start with the questions that shape a better decision.

How much of the tool environment should be mocked?

Mock the components needed for controlled diagnosis, and retain live integration cases for behaviour that fixtures cannot establish. Mark each dependency clearly. A mock verifies behaviour against its contract; it does not prove the real tool honors that contract.

Which artefacts make harness runs comparable?

Start with runner code, configuration manifests, fixtures, tool mocks and retained execution traces. Record their revision, owner and relationship to the intended workflow. Missing context should be identified before interpreting outcomes; a sanitised fixture is useful only when its relevant differences from the operating case are understood.

How should runner failures be distinguished from agent failures?

Run a known fixture through the harness twice, vary one dependency and inspect recorded configuration and outcomes. Keep task correctness, permitted action and final state distinct. Review scoring disagreements against the agreed rubric. Include valid alternatives so the cases do not reward superficial sequence matching or rejection of every difficult request.

What should a harness architecture specify?

The proposed output is a proposed runner architecture with fixture contracts, result schemas and reproducibility checks. Include the selected conditions, supporting observations, unresolved differences and next decision. A reviewer should be able to follow each important conclusion back to its evidence and understand the limits without depending on an undocumented explanation from the author.

When should live tools replace fixtures?

Use live integrations when their actual behaviour is part of the question, such as authentication, side effects or timing. Keep controlled fixtures for diagnosis and mark which conclusions depend on simulated behaviour.

What if existing evidence already answers the question?

Review its scope, provenance and configuration before proposing new work. Existing work from evaluation engineers and platform owners may already be sufficient. In that case, capture the decision, unresolved limitations and the change that would require another review. Additional assessment should address a real gap.

What would make the findings inconclusive?

Missing runner code, configuration manifests, fixtures, tool mocks and retained execution traces can prevent a reliable interpretation, depending on the case. Record the specific missing observation and its implication. The owner can supply evidence, narrow the claim or defer the dependent decision; an incomplete case should not silently be counted as a pass.

Start with the decision you need to make.

Tell us about the agent workflow you want reviewed, and where you need greater clarity. Scope and availability are confirmed together.

Connected disciplines